Yesterday the construction of the driveway started. Armed with a chainsaw and bobcat, Gene made the rough driveway ready for the culvert pipes and base on top.
Yesterday the construction of the driveway started. Armed with a chainsaw and bobcat, Gene made the rough driveway ready for the culvert pipes and base on top.