Ready for the next wash-out

IMG_7670

This week the driveway has been secured by adding concrete to the entry and exit points of all culvert pipes.
To the left are the two pipes that hopefully now take the water under the driveway rather than taking the base away.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IMG_7671

From above this barrier should guide the water into the pipes.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IMG_7674

 

 

 

 

 

 

 

On the roadside the big culvert pipe is now set in concrete on both ends.
This should be 100% rain proof.

 

 

 
IMG_7675

Leave a Reply

Your email address will not be published. Required fields are marked *