Although most of the floor joists were up, the 1/4 area on the westside, which will have the stairway to the first floor, is still open. Luckily today Hippie Dave showed up to work on that.
The beam shown here was made today and will carry the final 2 joists. For extra strength a pole will be placed where this beam and the other joists meet up