Taking it to the top

One of the major jobs still to be done is the ceiling in the great room and the bedroom,
so here’s 16 sheetrock boards, 36 2×4’s and 4 big packs of insulation  to create the ceiling, being unloaded:

Right now, we created a temporary floor that will allow us to put in the sheetrock in the gable ends of the upstairs,
which otherwise is very difficult to reach, as it is about 24′ (8 meters) up and the boards have to go in at a 45 degree angle.
More pictures on how that’s done tomorrow.

 