This is what the upstairs bathroom now looks like. Until today, it was my storage room. It has hardy backer board on the floor, as this will be tiled using the same tiles as downstairs. I probably won’t be finishing it this time, as I need to put a toilet, sink and shower in, and run the pipes through the wall to the technical area, which will be challenging. The reason I started, is that this room still had all kind of gaps to outside, making multiple entrances for Paper Wasps. I took out around 50 nests, some of which can be seen below