From constructing the downstairs bathroom I knew that bathrooms take a while, especially when you don’t want pipes to go down through the floor.
The pipes with P trap ( an illogical name in my opinion as the intention is not to trap pee but water) are in and the center pipe aligns with the drain.
With a few shims, the shower base was level, so it’s now in place, bolted down to the studs and with the drain connected.
The shower stall does not strike me as small; I can easily dance around in there without hitting the walls. I’ll be doing that dance when the whole thing is finished ðŸ¤
Keep your clothes on plse, if you’d decide to take photos!
No worries, nobody wants to see that anyway. 😊