This may seem like a never ending story, but I’m still making progress. Today I put the moisture resistant drywall into the shower stall.
After that, I started with the tiles;
It’s not difficult, just a bit labor intensive. I guess that’s the downside of choosing a small tile. My plan is to tile to the height a little bit under the rafter. Above that I will paint the wall white.