Don’t worry, I haven’t lost my faith and made a switch to an older version of the operating system,
but now have installed 6 windows, being all the windows that go into log walls.
All other will be placed in standard timber frame walls, 2 in the extension and 4 upstairs.
As it’s easier to get the windows upstairs installed when there are actual stairs to the second floor,
I worked on that too today (see post stringing along).
The silver strips on the sides and top will be covered by cedar.
Great progress! Almost done! 🙂